My Place Apartments, Hawthorn East
Works: Upgrade dosing systems for communal spas.
Project Info: The existing chemical controllers at My Place Apartments had come to the end of their working life and had no remote monitoring. Waterlink Free Chlorine Controllers with 24/7 remote monitoring were the preferred choice by the owners corporation for the upgrade works to comply with the new pool regulations.
Completion Date: December 2019
Willsmere, Kew
Works: Pool Re-Surfacing Works and Upgrade Plant Room Equipment
Project Info: Commercial Pool Systems (CPS) were contacted to upgrade the 25m pool and Toddler Pool at one of Melbourne’s most recognised landmarks. Willsmere was originally the Kew Asylum and Willsmere Hospital before being decommissioned in 1988. Placed on the historic buildings register in 1991, the property was redeveloped into 155 residential apartments with a further 101 townhouses added, and officially opened in 1993. In addition to re-designing the filtration system to increase the water turnover rate and fix the water make up system. CPS installed a state of the art Waterlink Free Chlorine Controller which is setup with Waterlink 24/7 remote monitoring and Envirogen Chlorinator to provide consistent Free Chlorine and pH levels.
Completion Date: November 2019
The Reserve Sandringham
Works: Hydraulics, Filtration, Dosing and Disinfection to Rooftop Pool and Spa
Project Info: The Reserve Apartments is a prestigious apartment complex in Sandringham. Magnapool Mineral Systems with Envirogen Touchscreen Chlorine Generators were chosen along with High Efficiency Baxi Boilers for the lowest energy costs.
Completion Date: September 2018
Ballarat & Clarendon College
Works: Construction of 25x10m Pool and Rowing Tank
Project Info: Ballarat & Clarendon is a progressive school that believes in the best facilities for its students. To this end it has installed the first InRiver rowing training tank in this world class fitness center. We constructed the Pool and Rowing Tank plant and also assisted in various facets of the construction. A Full touch screen PLC runs the entire plantroom, along with a unique “no chemicals” approach to the plantroom whereby no traditional chemicals such as liquid chlorine and hydrochloric acid are used in the pool (it runs completely on Magnapool minerals for chlorine generation and Carbon Dioxide for pH control- no other chemicals are needed).
Completion Date: August 2017
Peppers Soul, Gold Coast
Works: Filtration, Dosing and Disinfection
Project Info: Peppers Soul is a 5 star Hotel in the heart of Surfers. The initial builder went broke thru the build process 6 years ago and the equipment was subsequently under-specified and not up to task. We are in the process of completely re-vamping the filtration and dosing systems across the 6 pools and spas in the facility. Remote monitoring has been added to allow maintenance staff and external contractors to be across all facets of the Pool and Spa Plant.
Completion Date: December 2017
Ford Swim Center, St Pauls College Traralgon
Works: Construction of New 25x12m Pool Plant Room
Project Info: D&C Plant for new Pool including Hydraulics. Full PLC Touch screen to run the plantroom. VFD drives across all pumps. 3x 1.6m dia. Filters, 2x Lowara 316SS Pumps, Magnapool Commercial Mineral system, heat exchangers, UV, and Ozone. Design water treatment system to cater for 4000 kids per week.
Completion Date: August 2017
Novotel On Collins Melbourne
Works: New Pool and Spa Plant Room
Project Info: Novotel On Collins Pool and Spa Plant was part of the original building and was in need of an overhaul. Full strip out of the old plantroom, epoxy the floor, and reinstall new pumps and filtration, Magnapool Commercial Mineral system, heat exchangers, UV, and Ozone.
Completion Date: August 2017
Pelican Park Leisure Center
Works: Installation of new pool sub-board to Pool and Spa Plant Room
Project Info: Pelican Park consists of a 25x10m Pool, Toddler Pool, Wet Play area and Spa. The Pool Distribution Board and PLC was ageing and needed replacement. We designed, built and installed a new board to run the entire plant room. Council instructed works had to be done with minimal interruption to service so we literally ripped the heart out of the plantroom whilst manually maintaining heat, chemical balance and filtration quality. Patrons were completely unaware of the works in the plantroom and we met the clients targets and delivered the project in two weeks. One of the most challenging projects to date.
Completion Date: June 2017
Quay West Suites, Southbank
Works: Oversee new Pool and Spa Plantroom, Pool Hall renovation.
Project Info: Quay West Suites is a combined use building (Both OC residents and an Accor Hotel) which made the approach to this project unique, as previously both parties struggled to agree on the correct course of action. QWSM had a 20-year-old Pool and Spa that was leaking into the carpark below. A single filtration system serviced both the pool and spa and a complex heat pump and heat exchanger system was trying to maintain two different temperatures across the pool and spa (which wasn’t working). Other companies had previously advised that gas heating wasn’t an option due to the layout of the building. We gutted the plantroom, installed two Baxi condensing boilers in the carpark, installed new filtration plant to both the pool and the spa, Magnapool Mineral Water System, new heat exchangers, and are saving the OC approximately $8-10k in running costs PA. The pool and spa are now running at 30 and 37° respectively.
Completion Date: June 2016
Transforming Taree: Get Set Swim School's Major Upgrade
Twelve months after the AUSTSWIM "Soak It Up" conference on the Gold Coast, the team at Waterlink is highlighting the major prize winners, notably the Get Set Swim School. Following a meeting with Lisa Rodgers from Get Set Swim School, Waterlink's representative travelled to Taree to provide a quote and inspection for her swim school.
Upon inspection, it was clear that while the facility was impressive, the pool itself didn't reflect the high standards of the swim school. The existing system included a Rolla Chem one pump and a single 23-inch filter, which were insufficient for maintaining optimal water quality.
Recommended Upgrades for Get Set Swim School
Waterlink provided Lisa with a detailed quote and recommendations to bring the pool up to the required standards. The proposed solution included a Tere’o Touch commercial dosing system combined with monitoring and a WSE300 AOP UV system. This combination would keep combined chlorine levels (responsible for the unpleasant chlorine smell common in indoor pools) in check and eliminate harmful pathogens like cryptosporidium and Giardia. Additionally, it would enhance the overall look and feel of the water.
The Unexpected Windfall
A few weeks later, Lisa received a wonderful surprise: she was the lucky winner of the system upgrade giveaway at the Austswim conference. Seizing the opportunity, she decided to further upgrade the filtration system by installing two new 32-inch filters with AFM glass media
The Installation Process
Waterlink installed the following equipment:
- Tere’o Touch with remote monitoring
- WSE300 AOP UV System
This setup allows Lisa to stay on top of her water chemistry even when away from the center, providing her with peace of mind knowing that her patrons are swimming in the healthiest water possible.
The Results
Get Set Taree now boasts sparkling pool water with the following consistent levels:
- Active chlorine at 2.5 ppm
- pH at 7.6
- Combined chlorine comfortably between 0.4 - 0.6 ppm
The pool no longer has that overpowering chlorine smell, thanks to the advanced UV system.
A Collaborative Effort
Waterlink was assisted in the installation by Tony Arbidans from All Pool Solutions, ensuring a smooth and efficient upgrade process.
Conclusion
Twelve months on, the Get Set Swim School in Taree stands as a testament to the power of collaboration and innovation in the aquatic industry. With top-of-the-line equipment and meticulous attention to detail, the swim school now offers a superior swimming experience for all its patrons.
For more information on Waterlink's services and how they can help transform any facility, interested parties are encouraged to reach out.